Scope –
 • Wardrobe
 • Kitchen
 • Beds
 • Sofa
 • Dining
 • Ceiling
 • Lighting
 • Wall Decor/ Wallpaper
 • Accessories
 • Balcony Covers

1. 2bhk/3bhk/4bhk
Generally, a designer will take 15 – 20 days to design it and a contractor will take 30 – 60 days for building it. Timeline can be extended on the basis of materials and finishes.

2. In case of civil work (Increasing the space, removing of a wall, kitchen extension) may add on 15 – 20 days more depending upon the size of the work.